Lab Schedule: Psyc 2020L Research Design and Analysis 2
Winter 2001
Note that this is tentative and subject to changes. Check this URL often.
last revised March 23, 2000
Week
Date(s)Sec. A/B/C
Topic
1
Jan 11/13
Introduction to Lab Schedule/Lab Partners /Research Projects
2
Jan 18/20
surfing among flotsam and jetsam assignment
3
Jan 25/27
research project - RPA form
4
Feb 1/3
Introduce Stroop Lab
Research Project Method Section including all materials due
Completed RPA/Ethics form due, Ethics Peer Review
5
Feb 8/10
Stroop Lab analysis, lab report requirements
Flotsam and jetsam assignment due
6
Feb 15/17
Introduce Visual Displacement Lab
Stroop Lab due 
7
 Feb 22/24
Data Analysis for Visual Displacement Lab/ sample output
8
Feb 28-Mar3
Study Break
9
 Mar 7/9
Data should be collected for research project
Visual Displacement Lab due
consultation on research projects
10
Mar 14/16
Introduce spss assignment 
consultation on research projects
11
 Mar 21/23
spss assignment due
consultation on research projects
12
Mar 28/30
project .ppt due before 4:30 on Mon 27th(A) /Weds 29th (B/C)
Research Projects due in lab
Project  Presentations
13
Apr 4/6
Project  Presentations
Text in this colour (or similar) indicates a change to the original schedule distributed in lab
lecture schedule course outline links page

Tentative Grading system for Lab component
 

Assignments     6
Labs   14
Research Project   10
Total    30% of Psyc 2023 mark